Sunday 10 March 2013

Jobs update

All summer greens cut with pedestrian mowers at 5.5mm then sprayed with phosphite and iron to encourage growth, strengthen the plant and deter disease.

All approaches cut with triple mower at 8mm. These were also sprayed at the same time with the same mix as the greens.

All tees cut with triple mower at 8mm . Edges straightened with pedestrian. They were then sprayed with phosphite and soluble iron. A spring starter fertiliser was then applied.

Dig out the 11th approach and start adding sand. This should be completed and ready for turfing in the coming week.

Turf the remainder of the 6th ladies tee and edge in. This is now fully complete. A new drain has been dug out an is ready for pipe and gravel to be installed which will help stop water shedding on to the playin surface.

Turfed the rear section of the 16th green and edge in. This is now fully complete and just needs time to knit in. The summer green has been put back into play with the back third roped off to prevent damage to the new turf.

The 7th approach has now been turfed also and only a small section of rough remains to be turfed to complete the job.

Levelled off 17th yellow tee using a laser level. It is now in the process of being turfed and is almost complete.

Some of the smaller areas on the course requiring turf have been started and these will be ongoing.

Blaize added to path ways at 12th thru to the 7th and levelled off.

The compound and loading bay area has been cleaned out with an excavator and all excess materials dumped. All potholes levelled off with hardcore.