Monday 1 April 2013

Jobs update

Install new drainage pipe in front of ladies new tee at 6th. Included in this job was the installation of an open catchment channel 10 metres long which you can see in the pictures. This will collect water shedding off of the fairway onto the new tee.

Continue with gorse and scrub clearing on right hand side of sixth fairway.

Install extra stakes at new trees between 9/10 and 6/13 where wind was affecting them.

Dig out ditch at left of 11th fairway to help with drainage flow and bottom out with gravel to level base. Pictures included.

Dig out tree roots and stumps from 7th rough area that were causing problems with cutting. More roots and stumps will continue to be removed this week. Picture included.

Turf remaining area at the 7th approach side. This are us now complete and just needs some time to knit and root. Hopefully we get the weather to speed this process up which will allow us to get it back into play as quickly as possible.

Turf some patches on the 10th fairway which were worn out over the last season.

To finish the update, a recurring theme! Snow clearing around clubhouse and car park. Also salting pathways and icy areas.